iPhone
Start with the steps below. Editing tools appear beneath the canvas; tap the active tool to hide or show its controls.
iPad
Use the same task steps. The sidebar gives you access to Layout Builder, Templates, and Projects. In a wide editor window, controls can sit alongside the canvas; narrower windows use the compact panel. A missing control may be inside a collapsed section or the page’s options.
Find a project
- Projects lists projects by last activity. Tap one to continue editing; returning Home saves your changes.
- Use the project filter in Projects to switch between All Projects, Archive, and Recently Deleted.
- Use a project’s actions to rename it, open its All Captions, or manage its place in the library. Pin projects you want to keep out of automatic cleanup.
Understand cleanup
- Exported projects can move to Archive automatically. Inactive projects archive after 7 days and move to Projectsly Deleted after 30 days; pinned projects stay put.
- Restore a project from Archive or Recently Deleted when you need it again. Deleted projects are permanently removed after 30 days by default; change the period in Settings, including Never. Original and exported photos are never deleted.
- Project cleanup does not delete your original photos or the images you exported to Photos.
Mac
Open Projects in the library or choose Navigate → Go to Projects (Command-1). Check Archive when an exported project is no longer in the main list. Use Decks → Settings → Storage to inspect storage. Preserve original media outside Decks; a template is not a backup of photographs.